Studio Renovation
Renovation of a film production studio ( Phase A – Summer 2019 )
Design and construction of air conditioning – ventilation in a private cinema ( Phase B – Winter 2021 )
In the present project during the A phase of construction the following works were carried out :
- Reinforcement of existing loft
- Radical renovation of electrical ( Strong – Weak ) on 2 floors of the building
- Construction of plasterboard partitions
- Minor plumbing repairs
- Renovation of 1 WC
- Cleaning of existing marble, wood
During the B phase of the renovation in Winter 2021 the following works were carried out:
- Design & construction of Ventilation with Heat Recovery ( VAM )
- Design & construction of Air Conditioning System
in the private cinema – image and sound processing area of the company.

























© 2023 AXA ΤΕΧΝΙΚΗ. All Rights Reserved.
Designed & Developed with
by Another Point of View Studio